Techno-economic assessment of a hybrid solar system for medium-temperature industrial process heat

Location
Málaga, Spain
Skills & services
Energy modelling · Feasibility study · Thermal storage sizing · Cost analysis · MATLAB optimisation
of annual heat demand met by solar, up from 34.1%
64.9%
lifetime cost of heat, from €88.50 to €72.17/MWh
−18%
operational CO₂ per year from avoided electricity
−226 t

Can concentrating solar heat, thermal storage and an electric backup boiler reliably meet a continuous 1 MW steam demand, and does it pay? We modelled, sized and optimised the system over a 25-year lifetime.

The problem

Breweries need heat to produce steam for their production processes. Production can run day and night, but solar energy is only available during daylight hours.

We investigated whether combining solar heat, heat storage and an electric backup boiler could reliably meet an assumed continuous 1 MW heat demand at a brewery in Málaga, Spain. The goal was to understand how much electricity this setup could replace, and whether the investment would make financial sense.

What we developed

We modelled a system with three main components: curved concentrating solar collectors that focus sunlight to produce heat, a pressurised-water tank that stores excess heat for later use, and an electric boiler that covers any remaining demand.

Using local weather data from PVGIS, we simulated one year of operation in hourly steps. SAM (System Advisor Model) calculated solar heat production, while MATLAB decided each hour whether to use that heat directly, store it, or switch to electric backup. We assessed costs over a 25-year lifetime at a 10% discount rate.

How we improved the design

We started with a solar field sized at 1.8 times the design heat requirement and 12 hours of storage, then tested different combinations to see how solar-field size and storage affected cost and performance.

A Pareto analysis identified the balance between upfront investment and long-term heating cost. MATLAB's genetic algorithm then refined the storage size to find a lower-cost configuration. The selected design uses a solar field sized at 3 times the design heat requirement and about 20.7 hours of storage.

What this demonstrates

The smaller system was cheaper to build, but not cheaper over its lifetime. A separate electricity-price stress test raised the optimised heating cost by less than 1%, from €72.2 to €72.9/MWh, which shows the design is robust.

This project shows how we assess an energy solution, size its components, and explain the financial and environmental trade-offs before a client commits to an investment.

Weighing a similar investment?

Tell us about your operations, your targets or the investment you're weighing. The team that would deliver the work will reply within two working days.